{"id":1464,"date":"2026-09-08T06:05:05","date_gmt":"2026-09-08T06:05:05","guid":{"rendered":"https:\/\/mepco.co\/?post_type=blog&#038;p=1464"},"modified":"2026-09-12T01:15:43","modified_gmt":"2026-09-12T01:15:43","slug":"%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%af-%d8%b7%d9%88%d9%8a%d9%84%d8%a9-%d8%a7%d9%84%d8%aa%d9%88%d8%b1%d9%8a%d8%af-%d9%81%d9%8a-%d8%a7%d9%84%d9%85%d8%b4%d8%a7%d8%b1%d9%8a%d8%b9","status":"publish","type":"blog","link":"https:\/\/mepco.co\/en\/blog\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%af-%d8%b7%d9%88%d9%8a%d9%84%d8%a9-%d8%a7%d9%84%d8%aa%d9%88%d8%b1%d9%8a%d8%af-%d9%81%d9%8a-%d8%a7%d9%84%d9%85%d8%b4%d8%a7%d8%b1%d9%8a%d8%b9\/","title":{"rendered":"Long-Lead Items in Projects: How to Prevent Them from Disrupting Execution Before Work Begins"},"content":{"rendered":"<p><\/p>\n<p data-start=\"613\" data-end=\"971\">Many project managers find themselves powerless halfway through the execution phase when faced with a recurring and frustrating situation: the site is ready, the concrete works are complete, and construction crews are waiting for critical equipment that remains delayed at overseas manufacturing facilities or has encountered prolonged logistical disruption.<\/p>\n<p data-start=\"973\" data-end=\"1180\">In most cases, this delay is not caused by poor site execution. It results from an early strategic failure to anticipate complex supply-chain requirements and properly manage long-lead items in projects.<\/p>\n<p data-start=\"1182\" data-end=\"1382\">Managing these items is not merely a routine logistical procedure. It is a proactive engineering and planning decision that determines the success of the project\u2019s critical path and overall cash flow.<\/p>\n<p data-start=\"1384\" data-end=\"1619\">This guide, prepared for project managers, planners, and procurement teams in Saudi Arabia, provides an integrated roadmap for controlling critical procurement cycles and maintaining uninterrupted progress without unexpected stoppages.<\/p>\n<blockquote data-start=\"1621\" data-end=\"2182\">\n<p data-start=\"1623\" data-end=\"1640\">Direct Answer<\/p>\n<p data-start=\"1645\" data-end=\"2182\">Long-lead items in projects are systems, components, and equipment that require an extended period between the issue of the purchase order and final delivery to the site, usually between 16 and 36 weeks. They include main electrical transformers, chillers, fire pumps, and specialised steel sections. Effective control requires identifying them during the early design stage, approving their specifications, securing advance payments, and coordinating customs inspections and Saudi Building Code requirements before manufacturing begins.<\/p>\n<\/blockquote>\n<h2 data-section-id=\"1jvp5gk\" data-start=\"2184\" data-end=\"2252\">Executive Summary for Project Managers and Procurement Committees<\/h2>\n<ul data-start=\"2254\" data-end=\"2939\">\n<li data-section-id=\"pg5wj5\" data-start=\"2254\" data-end=\"2436\">Delays in identifying and securing long-lead items in projects can cause more than 60% of construction programmes to slip into forced delays and expose projects to delay penalties.<\/li>\n<li data-section-id=\"rjg0bd\" data-start=\"2437\" data-end=\"2571\">Early Procurement Packages provide an essential safeguard that isolates construction-site activities from global supply-chain risks.<\/li>\n<li data-section-id=\"xukazf\" data-start=\"2572\" data-end=\"2774\">Regulatory compliance in Saudi Arabia requires purchase orders to be coordinated with SABER, customs-clearance procedures, the Saudi Building Code, and Civil Defense requirements before manufacturing.<\/li>\n<li data-section-id=\"1uhh47r\" data-start=\"2775\" data-end=\"2939\">Integration with a general contractor that operates local metal fabrication facilities can reduce waiting periods by more than 40% compared with overseas imports.<\/li>\n<\/ul>\n<h2 data-section-id=\"10rk6iw\" data-start=\"2941\" data-end=\"3030\">1. What Are Long-Lead Items in Projects, and Why Can They Bring Sites to a Standstill?<\/h2>\n<p data-start=\"3032\" data-end=\"3287\">Long-lead items in projects are materials and systems that are custom-engineered, depend on scarce raw materials, or require complex manufacturing, sea freight, inspection, and customs-clearance procedures that exceed standard local-market lead times.<\/p>\n<p data-start=\"3289\" data-end=\"3567\">Traditional procurement methods fail when teams manage these materials through the usual sequential process: waiting for shop-drawing approval, approving samples, issuing requests for quotation to suppliers, negotiating commercial terms, and finally awarding the purchase order.<\/p>\n<p data-start=\"3569\" data-end=\"3818\">This delayed sequence causes equipment to arrive several months after its planned installation date, directly affecting critical-path activities such as closing architectural fa\u00e7ades, completing internal finishes, and conducting commissioning tests.<\/p>\n<h2 data-section-id=\"1qbeliy\" data-start=\"3820\" data-end=\"3907\">2. Principal Categories of Critical Materials and Equipment in Construction Projects<\/h2>\n<p data-start=\"3909\" data-end=\"4110\">Lead times vary according to the engineering system and its technological complexity. The following categories represent some of the most common long-lead items in projects within the Saudi market.<\/p>\n<h3 data-section-id=\"1yl4opt\" data-start=\"4112\" data-end=\"4144\">A. Specialised MEP Equipment<\/h3>\n<p data-start=\"4146\" data-end=\"4298\">These systems present a significant threat to the critical path because they require international production capacity and detailed technical approvals:<\/p>\n<ul data-start=\"4300\" data-end=\"5031\">\n<li data-section-id=\"xq86or\" data-start=\"4300\" data-end=\"4483\">Central chillers: Manufacturing and shipping generally require 24\u201336 weeks. Their installation also requires specific foundation dimensions and vibration-isolation arrangements.<\/li>\n<li data-section-id=\"8q8tyr\" data-start=\"4484\" data-end=\"4713\">Power transformers and main distribution boards: MDBs and switchgear generally require 20\u201330 weeks because they rely on intelligent circuit breakers and precision copper components subject to electricity-provider approvals.<\/li>\n<li data-section-id=\"5wvc9y\" data-start=\"4714\" data-end=\"4885\">Approved fire-pump sets: UL\/FM fire pumps require approximately 18\u201326 weeks for manufacturing and compliance with Saudi Building Code and Civil Defense requirements.<\/li>\n<li data-section-id=\"2a64yx\" data-start=\"4886\" data-end=\"5031\">Emergency diesel generators: These require approximately 20\u201328 weeks, including Automatic Transfer Switch panels and noise-control systems.<\/li>\n<\/ul>\n<h3 data-section-id=\"11fgu6v\" data-start=\"5033\" data-end=\"5087\">B. Structural Steel and Fabricated Metal Materials<\/h3>\n<p data-start=\"5089\" data-end=\"5191\">Industrial facilities, warehouses, and commercial buildings may face extended procurement periods for:<\/p>\n<ul data-start=\"5193\" data-end=\"5446\">\n<li data-section-id=\"1t3jdi1\" data-start=\"5193\" data-end=\"5312\">Heavy structural steel sections and long-span trusses that require specialist raw materials and detailed engineering.<\/li>\n<li data-section-id=\"sjgsmg\" data-start=\"5313\" data-end=\"5446\">External cladding panels and fire-resistant insulation systems requiring laboratory testing and Civil Defense conformity approvals.<\/li>\n<\/ul>\n<h2 data-section-id=\"135spj8\" data-start=\"5448\" data-end=\"5488\">3. Early Procurement Package Strategy<\/h2>\n<p data-start=\"5490\" data-end=\"5667\">Controlling long-lead items in projects requires breaking the traditional project sequence and adopting a proactive engineering strategy known as Early Procurement Packages.<\/p>\n<ol data-start=\"5669\" data-end=\"6442\">\n<li data-section-id=\"mm8yew\" data-start=\"5669\" data-end=\"5891\">Separate tender packages for critical equipment: The owner or consultant issues procurement tenders for major equipment during the architectural and structural design stage, before appointing the general contractor.<\/li>\n<li data-section-id=\"d9574n\" data-start=\"5892\" data-end=\"6149\">Direct contracting and novation: The owner issues a Letter of Intent or Advance Purchase Order to the manufacturer to reserve production capacity, then formally transfers management of the contract to the general contractor following its appointment.<\/li>\n<li data-section-id=\"i0vr2y\" data-start=\"6150\" data-end=\"6442\">Design based on actual equipment data: Instead of relying on assumed weights, openings, and electrical requirements, early procurement enables designers to use the actual dimensions and loads of the selected equipment in structural and shop drawings, avoiding subsequent modifications.<\/li>\n<\/ol>\n<h2 data-section-id=\"it6bys\" data-start=\"6444\" data-end=\"6483\">4. Long-Lead Items Tracking Register<\/h2>\n<p data-start=\"6485\" data-end=\"6670\">This engineering register is the primary tool for managing procurement risks and controlling the planned arrival date of every item classified among the long-lead items in projects.<\/p>\n<div class=\"group TyagGW_tableContainer TyagGW_tableContainerWithTableOfContents\">\n<div class=\"TyagGW_tableWrapper flex flex-col-reverse w-fit\" tabindex=\"-1\">\n<table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"6672\" data-end=\"7771\">\n<thead data-start=\"6672\" data-end=\"6859\">\n<tr data-start=\"6672\" data-end=\"6859\">\n<th class=\"last:pe-10\" data-start=\"6672\" data-end=\"6705\" data-col-size=\"sm\">Critical Material or Equipment<\/th>\n<th class=\"last:pe-10\" data-start=\"6705\" data-end=\"6741\" data-col-size=\"sm\">Manufacturing and Shipping Period<\/th>\n<th class=\"last:pe-10\" data-start=\"6741\" data-end=\"6783\" data-col-size=\"md\">Advance Technical Approval Requirements<\/th>\n<th class=\"last:pe-10\" data-start=\"6783\" data-end=\"6817\" data-col-size=\"md\">Required Inspection and Testing<\/th>\n<th class=\"last:pe-10\" data-start=\"6817\" data-end=\"6859\" data-col-size=\"md\">Approval Authority or Mandatory System<\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"6883\" data-end=\"7771\">\n<tr data-start=\"6883\" data-end=\"7040\">\n<td data-start=\"6883\" data-end=\"6906\" data-col-size=\"sm\">Central chillers<\/td>\n<td data-col-size=\"sm\" data-start=\"6906\" data-end=\"6920\">26\u201332 weeks<\/td>\n<td data-col-size=\"md\" data-start=\"6920\" data-end=\"6979\">Approval of thermal calculations and foundation drawings<\/td>\n<td data-col-size=\"md\" data-start=\"6979\" data-end=\"7005\">Factory Acceptance Test<\/td>\n<td data-col-size=\"md\" data-start=\"7005\" data-end=\"7040\">Saudi Building Code SBC 501\/601<\/td>\n<\/tr>\n<tr data-start=\"7041\" data-end=\"7255\">\n<td data-start=\"7041\" data-end=\"7082\" data-col-size=\"sm\">Switchgear and distribution boards<\/td>\n<td data-start=\"7082\" data-end=\"7096\" data-col-size=\"sm\">22\u201328 weeks<\/td>\n<td data-start=\"7096\" data-end=\"7159\" data-col-size=\"md\">Approval of circuit and capacity drawings, including the SLD<\/td>\n<td data-start=\"7159\" data-end=\"7204\" data-col-size=\"md\">Factory inspection and integration testing<\/td>\n<td data-start=\"7204\" data-end=\"7255\" data-col-size=\"md\">SASO and Saudi Electricity Company requirements<\/td>\n<\/tr>\n<tr data-start=\"7256\" data-end=\"7418\">\n<td data-start=\"7256\" data-end=\"7273\" data-col-size=\"sm\">Fire pumps<\/td>\n<td data-start=\"7273\" data-end=\"7287\" data-col-size=\"sm\">18\u201324 weeks<\/td>\n<td data-start=\"7287\" data-end=\"7324\" data-col-size=\"md\">Approval of hydraulic calculations<\/td>\n<td data-col-size=\"md\" data-start=\"7324\" data-end=\"7372\">International quality-certification documents<\/td>\n<td data-col-size=\"md\" data-start=\"7372\" data-end=\"7418\">Saudi Civil Defense and UL\/FM certificates<\/td>\n<\/tr>\n<tr data-start=\"7419\" data-end=\"7594\">\n<td data-start=\"7419\" data-end=\"7458\" data-col-size=\"sm\">Heavy steel structures and beams<\/td>\n<td data-col-size=\"sm\" data-start=\"7458\" data-end=\"7472\">16\u201322 weeks<\/td>\n<td data-col-size=\"md\" data-start=\"7472\" data-end=\"7500\">Approval of shop drawings<\/td>\n<td data-col-size=\"md\" data-start=\"7500\" data-end=\"7556\">Weld inspection and non-destructive thickness testing<\/td>\n<td data-col-size=\"md\" data-start=\"7556\" data-end=\"7594\">SBC 306 and certificates of origin<\/td>\n<\/tr>\n<tr data-start=\"7595\" data-end=\"7771\">\n<td data-start=\"7595\" data-end=\"7620\" data-col-size=\"sm\">Power transformers<\/td>\n<td data-col-size=\"sm\" data-start=\"7620\" data-end=\"7634\">24\u201330 weeks<\/td>\n<td data-col-size=\"md\" data-start=\"7634\" data-end=\"7691\">Approval of loss, cooling, and insulation certificates<\/td>\n<td data-col-size=\"md\" data-start=\"7691\" data-end=\"7729\">Insulation and high-voltage testing<\/td>\n<td data-col-size=\"md\" data-start=\"7729\" data-end=\"7771\">Saudi Electricity Company requirements<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<h2 data-section-id=\"n1tpqp\" data-start=\"7773\" data-end=\"7848\">5. Saudi Regulatory Compliance: Customs Clearance and the SABER Platform<\/h2>\n<p data-start=\"7850\" data-end=\"8044\">Overseas shipments of engineering materials and equipment can become a major project risk if they reach Saudi ports without satisfying digital-registration and technical conformity requirements.<\/p>\n<p data-start=\"8046\" data-end=\"8137\">Teams managing long-lead items in projects should comply with the following procedures:<\/p>\n<ul data-start=\"8139\" data-end=\"8857\">\n<li data-section-id=\"14i6nnx\" data-start=\"8139\" data-end=\"8351\">SABER registration: Confirm that the manufacturer obtains Shipment Certificates and Product Certificates for products subject to Saudi technical regulations before the shipment leaves the country of origin.<\/li>\n<li data-section-id=\"hfp7s2\" data-start=\"8352\" data-end=\"8597\">Integration with the FASAH customs platform: Prepare digital invoices, bills of lading, and packing lists and coordinate in advance with approved customs brokers to complete clearance quickly and avoid storage charges and container delays.<\/li>\n<li data-section-id=\"b50rsw\" data-start=\"8598\" data-end=\"8857\">Saudi Building Code and Civil Defense requirements: Require the supplier to provide original approved laboratory certificates requested by inspection committees, municipalities, and the Balady platform to prevent rejection of the supplied items on-site.<\/li>\n<\/ul>\n<h2 data-section-id=\"jguj2\" data-start=\"8859\" data-end=\"8926\">6. Verification, Quality Control, and Factory Acceptance Testing<\/h2>\n<p data-start=\"8928\" data-end=\"9136\">Protecting the project from unexpected problems requires more than confirmation that the equipment has been shipped. Technical performance must be verified before the equipment leaves the production facility.<\/p>\n<p data-start=\"9138\" data-end=\"9245\">Effective planning for long-lead items in projects includes the following rigorous inspection protocol:<\/p>\n<ul data-start=\"9247\" data-end=\"10012\">\n<li data-section-id=\"4fla9x\" data-start=\"9247\" data-end=\"9557\">Factory Acceptance Tests: A representative of the owner or a specialist engineering consultant attends the manufacturer\u2019s facility to test the equipment under simulated maximum operating loads and confirm full compliance with the values stated in the technical specifications before packing and shipment.<\/li>\n<li data-section-id=\"1spw1dt\" data-start=\"9558\" data-end=\"9833\">Protection during packaging and long-term storage: Equipment must be packaged against humidity and salt corrosion during sea freight. An insulated and conditioned site-storage environment should be provided if the equipment arrives before its planned installation date.<\/li>\n<li data-section-id=\"3c4669\" data-start=\"9834\" data-end=\"10012\">Site Acceptance Tests: The equipment must be inspected immediately after unpacking to confirm that it has not sustained damage during transportation, loading, or unloading.<\/li>\n<\/ul>\n<h2 data-section-id=\"1ce52wm\" data-start=\"10014\" data-end=\"10073\">7. The Added Value of Engineering Integration with MEPCO<\/h2>\n<p data-start=\"10075\" data-end=\"10401\">The main distinction between conventional and strategic contracting lies in the contractor\u2019s ability to adapt to logistical challenges and secure critical supply routes. MEPCO provides this capability through extensive experience in managing <a class=\"decorated-link\" href=\"https:\/\/mepco.co\/ar\/general-contracting\/\" target=\"_new\" rel=\"noopener\" data-start=\"10317\" data-end=\"10400\">integrated General Contracting services<\/a>.<\/p>\n<p data-start=\"10403\" data-end=\"10565\">MEPCO applies a centralised procurement-management approach that identifies and secures critical supplies and MEP equipment from the earliest days of the project.<\/p>\n<p data-start=\"10567\" data-end=\"10887\">The company also operates an advanced industrial arm through its <a class=\"decorated-link\" href=\"https:\/\/mepco.co\/ar\/steel-industries\/\" target=\"_new\" rel=\"noopener\" data-start=\"10632\" data-end=\"10714\">Industrial and Metal Fabrication division<\/a>, providing significant flexibility to manufacture structural steel, trusses, panels, and engineering accessories locally in accordance with current international standards.<\/p>\n<p data-start=\"10889\" data-end=\"11141\">This local manufacturing capability protects clients\u2019 projects against fluctuating international shipping conditions and high overseas freight costs. It also provides rapid alternative engineering solutions that maintain uninterrupted progress on-site.<\/p>\n<h2 data-section-id=\"jrhqmw\" data-start=\"11143\" data-end=\"11200\">8. Supply Risk Management Checklist Before Work Begins<\/h2>\n<p data-start=\"11202\" data-end=\"11332\">Before approving the project\u2019s construction programme, carefully review the following checklist to confirm supply-chain readiness:<\/p>\n<ul class=\"contains-task-list\" data-start=\"11334\" data-end=\"12050\">\n<li class=\"task-list-item\" data-section-id=\"1bn0u0c\" data-start=\"11334\" data-end=\"11441\"><input disabled=\"disabled\" type=\"checkbox\" \/> Has a complete list of all long-lead items in projects been prepared and included in the risk report?<\/li>\n<li class=\"task-list-item\" data-section-id=\"fjj4cp\" data-start=\"11442\" data-end=\"11566\"><input disabled=\"disabled\" type=\"checkbox\" \/> Have binding final dates been established for approving shop drawings and technical submittals for critical equipment?<\/li>\n<li class=\"task-list-item\" data-section-id=\"1imrkl8\" data-start=\"11567\" data-end=\"11695\"><input disabled=\"disabled\" type=\"checkbox\" \/> Has a clear budget been allocated for advance payments secured by bank guarantees to activate purchase orders immediately?<\/li>\n<li class=\"task-list-item\" data-section-id=\"obsp01\" data-start=\"11696\" data-end=\"11821\"><input disabled=\"disabled\" type=\"checkbox\" \/> Do the procurement requirements comply with the Saudi Building Code, Civil Defense regulations, and the SABER platform?<\/li>\n<li class=\"task-list-item\" data-section-id=\"1cnae24\" data-start=\"11822\" data-end=\"11924\"><input disabled=\"disabled\" type=\"checkbox\" \/> Have the procedures and budget for Factory Acceptance Tests of major MEP equipment been defined?<\/li>\n<li class=\"task-list-item\" data-section-id=\"136g8j6\" data-start=\"11925\" data-end=\"12050\"><input disabled=\"disabled\" type=\"checkbox\" \/> Have local and national manufacturing alternatives been investigated to reduce import and international-shipping risks?<\/li>\n<\/ul>\n<h2 data-section-id=\"gvj50d\" data-start=\"12052\" data-end=\"12087\">9. Conclusion and Call to Action<\/h2>\n<p data-start=\"12089\" data-end=\"12313\">Managing long-lead items in projects is not an optional planning exercise. It is fundamental to protecting project budgets and preventing delay penalties and contractual claims that burden both investors and contractors.<\/p>\n<p data-start=\"12315\" data-end=\"12595\">Early forecasting of manufacturing periods, coordination between design and procurement teams, and partnership with an integrated general contractor offering local manufacturing and engineering capabilities provide the ideal formula for delivering successful projects on schedule.<\/p>\n<p data-start=\"12597\" data-end=\"12930\">If you are planning a new construction or industrial project and require an engineering strategy that secures supply chains and protects your programme, <a class=\"decorated-link\" href=\"https:\/\/mepco.co\/ar\/contact\/\" target=\"_new\" rel=\"noopener\" data-start=\"12750\" data-end=\"12814\">contact MEPCO\u2019s engineering team<\/a> to discuss your technical requirements and secure integrated procurement and fabrication packages for your project.<\/p>\n<h2 data-section-id=\"kapibi\" data-start=\"12932\" data-end=\"12995\">Frequently Asked Questions About Long-Lead Items in Projects<\/h2>\n<h3 data-section-id=\"huooxj\" data-start=\"12997\" data-end=\"13062\">Q1: When should a material be classified as a long-lead item?<\/h3>\n<p data-start=\"13064\" data-end=\"13380\">A material is classified as a long-lead item when the time required to prepare and approve its drawings, manufacture it, conduct factory testing, and deliver it to the project site exceeds the time available in the programme before its planned installation date\u2014or when the total procurement period exceeds 16 weeks.<\/p>\n<h3 data-section-id=\"u4v9xg\" data-start=\"13382\" data-end=\"13460\">Q2: How do Early Procurement Packages protect the project\u2019s critical path?<\/h3>\n<p data-start=\"13462\" data-end=\"13704\">Early Procurement Packages protect the project by allowing manufacturing and supply orders for principal critical equipment, such as switchgear and chillers, to be issued during the design stage and before the general contractor is appointed.<\/p>\n<p data-start=\"13706\" data-end=\"13841\">This reserves production capacity and saves several months that might otherwise be lost through later procurement and award procedures.<\/p>\n<h3 data-section-id=\"1diunc1\" data-start=\"13843\" data-end=\"13949\">Q3: What role do SABER and Saudi customs procedures play in scheduling the arrival of long-lead items?<\/h3>\n<p data-start=\"13951\" data-end=\"14125\">Saudi Arabia requires engineering shipments subject to technical regulations to obtain conformity certificates through the SABER platform before entering the country\u2019s ports.<\/p>\n<p data-start=\"14127\" data-end=\"14334\">Failing to coordinate SABER certificates and customs-clearance requirements in advance can cause shipments to remain at ports for several weeks and result in accumulating storage charges and delay penalties.<\/p>\n<h3 data-section-id=\"2losig\" data-start=\"14336\" data-end=\"14417\">Q4: What financial guarantees are required for extended procurement packages?<\/h3>\n<p data-start=\"14419\" data-end=\"14626\">To protect the owner when advance payments are made for long-lead equipment before it reaches the site, the manufacturer or supplier should provide a valid Advance Payment Guarantee equal to the amount paid.<\/p>\n<p data-start=\"14628\" data-end=\"14720\">The guarantee remains valid until the equipment is delivered and passes the site inspection.<\/p>\n<h3 data-section-id=\"1nj9ji0\" data-start=\"14722\" data-end=\"14788\">Q5: How does local metal fabrication reduce procurement risks?<\/h3>\n<p data-start=\"14790\" data-end=\"14950\">Local fabrication of structural steel, panels, and construction accessories reduces sea-freight time, port procedures, and exposure to geopolitical disruptions.<\/p>\n<p data-start=\"14952\" data-end=\"15098\" data-is-last-node=\"\" data-is-only-node=\"\">\n<p><\/p>","protected":false},"featured_media":1486,"template":"","class_list":["post-1464","blog","type-blog","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/mepco.co\/en\/wp-json\/wp\/v2\/blog\/1464","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mepco.co\/en\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/mepco.co\/en\/wp-json\/wp\/v2\/types\/blog"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mepco.co\/en\/wp-json\/wp\/v2\/media\/1486"}],"wp:attachment":[{"href":"https:\/\/mepco.co\/en\/wp-json\/wp\/v2\/media?parent=1464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}